One the famous piling method is Micro
piling, which is in the complicated locations and tunnels.
Preparation
Contractor must prepare the method of
statement and risk assessment and design mix calculation, manpower data, all
the safety and legal checklist before sating the piling projects.
Pile Location
Piling equipment carefully mobilized
in to the site and park. Ensure all the pile location points by the approved surveyor
of the main contractor. If the contract mentions the make the location is done
by sub contractor that means piling contractor should ensure the pile location
by own surveyor based on the piling drawing.
Safety
All the worker must attended the in-house
safety rules in the site and ensure they must understand the risk assessment.
Ensure the entire check list for the safety site before start the piling process.
Piling rig must drive on the safe access like sheet plat
Drive
Must ensure the pile qualities like
pile vertical, pile length, pile size, temporary casing or permanent casing
position. Especially the vertical of the pile must check every one meter depth
that you drive. Before leave the location must check the depth and conform to
the authorized personal. If once start the re bar installation then difficult to
drill again. It is wasting of your time and energy.
Re bar installation
Steel re bar must be fabricate as the
same time of boring. If you select that use the free fabricate materials then
must ensure sufficient pieces have on site. Re bar must be inserting vertically
and joints must fix properly. It’s very important for the quality of the pile.
Grouting hose must insert with the re bar gauge.
Grouting
Wash properly to the boring hole
through the grouting hose, when the water come out like clean water then you
may stop and start to grout. Ensure the water cement ratio and chemical compounds
for the setting process based on the design mix of the pile. When you pump the
cement mix, maintain the steady flow and the mean time don’t forgot to take
pull the grouting hose. During the grouting water may overflow from the boring
hole as the same the cement come out like harder thick then you may conform
with authorized person to stop the grouting
General Points
Must fallow the safety rules and use
the personal productive equipment's at all the times. Spacer all placed and ties
properly with the steel re bar gauge. Don’t forget to take the cube for the cube
test to know the strength of grouting cement. Maintain the steady flow of the
cement pump if not you may facing your pump may be chock.